Date Posted | Contract Title | Dollar Amount | City Agency | Staff Contact |
---|---|---|---|---|
5/26/2022 | Preventative Maintenance for 5 Rooftop Units at 2002 Zeier Rd. | $9,500 | Engineering | Jon Evans 608-243-5893 |
5/19/2022 | Sprinkler Modifications at 2002 Zeier Rd. | $24,994 | Engineering | Jon Evans 608-243-5893 |
5/16/2022 | Installation of Conduit and Door Position Switches at Fleet Headquarters, 4151 Nakoosa Trail | $24,900 | Engineering | Jon Evans 608-243-5893 |
5/4/2022 | Design and Install of a Fire Alarm System at 2002 Zeier Rd | $22,238.29 | Engineering | Jon Evans 608-243-5893 |
4/26/2022 | Gutter work at 4502 Milwaukee St. (Shield of Hope Shelter) | $9,950 | Engineering | Jon Evans 608-243-5893 |
3/7/2022 | Prescribed Burns and Follow Up Invasive Species Control | $8,570.00 | Engineering | Maddie Dumas 608-266-9525 |
2/22/2022 | DCR Conference Room 5th Floor CCB | $11,096 | Engineering | Jeanine Zwart 608-267-8749 |
1/31/2022 | Warner Park Pedestrian Bridge | $22,700 | Parks | Kate Kane 608-261-9671 |
1/4/2022 | Gates of Heaven Storm Windows | $19,952 | Engineering | Amy Scanlon 608-267-0743 |
11/3/2021 | Electrical Conduit for New Condenser at 1120 Sayle St. | $10,000 | Engineering | Jon Evans 608-243-5893 |
10/28/2021 | Madison Fire Station 6 Qualitative Air Barrier and Thermography Testing | $5,250 | Engineering | Jon Evans 608-243-5893 |
9/7/2021 | 3202 Dairy Drive Campground Site | $24,779 | Engineering | Bryan Cooper 608-261-5533 |
9/3/2021 | Controls upgrade at 1120 Sayle St. | $24,855 | Engineering | Jon Evans 608-243-5893 |
9/3/2021 | Installation of new condenser at 1120 Sayle St. | $24,813 | Engineering | Jon Evans 608-243-5893 |
6/11/2021 | Madison Police Central District Countertop Replacement | $26,303.00 | Engineering/MPD | Laura Amundson 608-243-5892 |
3/9/2021 | 4502 Milwaukee St. Roof Repairs | $7500 | Engineering | Jon Evans 608-243-5893 |
3/9/2021 | Madison Fire Station No. 7 Roof ice prevention system | $6,940.33 | Engineering | Mike Schuchardt 608-261-9249 |
2/16/2021 | Smoke Detector Install at 4502 Milwaukee St | $9900 | Engineering | Jon Evans 608-243-5893 |
2/3/2021 | Direct Purchase of Fire Alarm Equipment for 4502 Milwaukee St | $21,000 | Engineering | Jon Evans 608-243-5893 |
2/3/2021 | Design and Install of a Fire Alarm for 4502 Milwaukee St | $23,000 | Engineering | Jon Evans 608-243-5893 |
2/1/2021 | Smoke Sealing Walls at 4502 Milwaukee St . | $24,640 | Engineering | Jon Evans 608-243-5893 |
1/14/2021 | HVAC Repairs at Karmenta Nursing Home | $9900 | Engineering | Jon Evans 608-243-5893 |
11/23/2020 | Equipment upgrades to greenhouse warming tables | $9,500 | Parks/Engineering | Randy Wiesner 608-267-8679 |
10/12/2020 | Monona Terrace- Generator exhaust extension | $8,610 | Monona Terrace/Engineering | Jon Evans 608-243-5893 |
10/06/2020 | Monona Terrace - Concrete and Conduit Repair | $9670 | Monona Terrace/Engineering | Jon Evans 608-243-5893 |
10/06/2020 | Monona Terrace - Tunnel Exhaust Fan Electrical Repair | $2,184 | Monona Terrace/Engineering | Jon Evans 608-243-5893 |
9/18/2020 | MATC North Ditch Repair | $12,532 | Engineering | Sally Swenson 608-266-4862 |
9/18/2020 | MPD Central Property/GR10 Interior Wall Painting | $9850 | Engineering | Laura Amundson 608-243-5892 |
6/2/2020 | Foundation for pre-fab communications building, 10451 Old Sauk Rd | $24,950 | Engineering | Dave Schaller 608-243-5891 |
2/23/2020 | A/V Maintenance Support at Madison Muncipal Building | $31,120 | Engineering | Jon Evans 608-243-5893 |
2/19/2020 | Spring 2020 Prescribed Burns | $10,626.00 | Engineering | Maddie Dumas 608-266-9525 |
2/11/2020 | Grassman Pond Erosion Repair (2019) | $24,032 | Engineering | Carissa Wegner 608-261-9822 |
11/07/19 | Pinney Library Children's Area Vinyl on Glass | $7,900 | Madison Public Library/Engineering | Amy Scanlon 608-267-0743 |
10/28/19 | Villager Mall SF Energy Improvements | $9,900 | CDA | Jon Evans 608-243-5893 |
8/15/19 | Hazardous Waste Removal - Streets East | $17,465.25 | Engineering | Brent Pauba 608-266-4092 |
8/14/19 | Sequoya Library Boiler Controls | $19,760 | Engineering | Matt Gall 608-261-9620 |
8/14/19 | Sequoya Library Broiler Install | $24,670 | Engineering | Matt Gall 608-261-9620 |
6/4/19 | Split AC Cooling Unit for MMB Data Closet | $8,400 | Engineering | Jon Evans 608-243-5893 |
5/28/19 | Building Automation System Upgrades 2019 | $6,950 | Engineering | Jon Evans 608-243-5893 |
3/11/19 | Concrete work at Breese Stevens Field | $24,998 | Parks Div. | Mike Sturm 608-267-4921 |
2/7/19 | Central Library Conference Room Wall | $7,795 | Madison Public Library | Brian Jensen 608-266-6355 |